Sequence of testing the surface For accumulators Ux formatting logical surface is the record into the formatiruyemuyu region of any data through ATA- interface (on the logical coordinates). Imperatively one should conduct formatting accumulator, also, before beginning, strictly, the search for defects. The preliminary formatting of surface is necessary for the exception of interpretation as the physical defects of sectors with the incorrect Comte by the rolled sum and the sectors with the incorrect number of sector in his title. For accelerating formatting entire surface we advise to use a point of menu Actions - > Quick Clear. Point "Quick Clear" in the utility is realized with the aid of Ata- command Security Erase Unit; therefore during the random interruption of the rapid erasure of accumulator will have to remove that established from it by utility password.
The possibility of checking the surface on the logical coordinates only requires the required formatting of surface after the sequential concealment of defects in P -.list. Otherwise, from the now concealed into P -.list defect to the end of the physical track, on the coto bark rum the defect of nakhodils 4, for all sectors during an attempt at reading will be returned error UNC. This by the noncoincidence of the numbers of these sectors in their titles with the numbers, coto bark rye caused expects the translator of accumulator. Formatting will lead to the copying Nome ditch in the titles at the correct values.
One should produce testing the surface of that newly entered of nakopitel 4 in the following sequence: 34) Test->.Bufer – testing the data bus Ata- interface. 3 5) Actions - > Quick Clear – for eliminating Unc- the errors, not caused by the physical surface damage. 36) Defectlist - > G -.list - > Clear on disk – the removal of the acquired defects (in the process of operation). 37) Test - > Verify forward(.reverse) - the rough testing of surface by verification. Obtained defects during the tests not to hide, but to accumulate in the list. 3 8) Recovery - concealment of the obtained defects by united list into P -.list. 39) Test - > Write forward – formatting surface after the concealment of defects obtained in verify- tests. Its number for the subsequent testing of the errors of the translator of accumulator –so into each sector will be brought in. 40) Test->.Read+.Check – testing surface by reading and checking the translator of accumulator. 41) Test->.Defectoscope – testing (thinner) surface with the installation of the maximum time of the response of surface. 42) Recovery - the concealment of the obtained defects by united list into P -.list. 43) Actions ->.Tsuichk Clear – formatting surface after the concealment of defects in P -.list. 上一篇:HRT的Seagate Drives U6英文说明书 下一篇:HRT安装技巧经验 |